Worked closely with the Electrical Contractor to coordinate this $20M renovation to a 1957 Student Center. Leaving the majority of the existing utilities in place and utilizing these for additional services and capacity proved to be the largest challenge. We field verified and modeled the existing electrical system and coordinated the installation of the new design.